Improving drainage and roadway safety
Construction as part of this improvements project included replacing six culverts, replacing and adding guardrails, and addressing soil erosion concerns at two road embankment locations along ravines. In addition, the roadway was widened at the culvert locations.
The updates made on Dayton River Road will improve the safety of people driving, increase the longevity of the roadway and reduce drainage issues requiring frequent maintenance.